The City consulted with the Ellenbrook community in February 2023 in relation to resident concerns around the increase in traffic in the area, particularly on Arbor Drive and Brookmount Drive. A local area traffic management study was undertaken to review these issues.
The Local Area Traffic Management Study has now been finalised. The City will be progressing with traffic calming measures along Brookmount Drive and Arbor Drive as a priority to address rat running behaviour on this route. Further information and consultation on these treatments with affected residents will follow in due course.
Please refer to the map below for a summary of some of the key improvements that are planned for implementation.
Latest News
Brookmount Drive
The City of Swan advises that it will shortly commence road rehabilitation works and the installation of new raised platforms at Brookmount Drive, Ellenbrook. The work is being undertaken to improve traffic safety in this area.
The scope of this project includes road rehabilitation and the installation of three new raised safety platforms. The road reconstruction will take place on Brookmount Drive, between approximately 45 metres south of Arbor Drive and approximately 40 metres north of Granesse Drive. The new raised safety platforms will be positioned at three locations along Brookmount Drive, as indicated in green on the attached plans.
As part of the works, bus stop 23320 (Brookmount Drive after Molloy Lane) will be shifted approximately 15 metres to the south, as its current position would clash with the raised platform installation. This bus stop is included in the Public Transport Authority’s Bus Stop Accessibility Program and a new hardstand will be constructed at this location.
Works will commence on Monday, January 6, 2025 between the hours of 7AM and 5PM and will be substantially completed within six weeks of commencement. The works may be extended in the event of inclement weather, contractor’s availabilities and/or unforeseen conditions.
To accommodate the works and ensure the safety of the construction staff and the general public, traffic management measures will be implemented. Where possible, single-lane closures with stop/slow traffic controls will be used. However, for the majority of the road reconstruction and resurfacing works, full road closures will be implemented, with detours in place. Local traffic will be permitted through, and the road will be reopened at the end of each day shift.
If you have any questions or concerns regarding the works please do not hesitate to contact the Project Manager.View location of proposed works
Proposed road rehabilitation (red) and raised safety platforms (green) between Arbor Drive and Delmage Circle and at the intersection of Brookmount Drive and Granesse Drive, Ellenbrook
Proposed raised safety platform between Molloy Lane and Charlottes Vista, Ellenbrook
Arbor Drive
Notification of works sent to surrounding residents and community members who responded to the community consultation.
The scope of this project includes installation of four new raised safety platforms. The new raised safety platforms will be positioned between Withnell Drive and Bancombe Crescent (two platforms), at the intersection of Arbor Drive and Birkett Circuit, and between Pym Lane and The Broadway
Works will commence on Monday, October 7, 2024 and will be completed within two weeks.
Feedback reviewed
Ellenbrook Local Area Traffic Management
Recently you spent some time providing us with your online feedback about the Traffic Management in the Ellenbrook Local Area.
All feedback was reviewed and we have now received a draft report from the consultants. Traffic modelling is being arranged to understand options and implications with the preferred route via The Promenade and The Broadway.
Once these works are complete, final recommendations will be put forward in relation to treatment options.
Thank you for your participation
Thank you for participating in the Ellenbrook Local Area Traffic Management Study survey and providing us with your valuable feedback.
We received a total of 90 submissions and have been reviewing all responses received. The feedback has now been collated and will be passed on to the consultant for further review and investigation.
Further updates will be provided once the consultant review has been completed.